|
 |
Reference Photos |
 |
 |
BR-A TALISMAN OFFSHORE PLATFORM
(Ultrasonic Flow meter Remover and Reinstallation) |
| |
This project was carried out at TALISMAN PM3/BRA Offshore Platform .The scope of this job was to remove the existing Ultrasonic Flow meter (12” 1500#) and re install a new meter using hydraulic bolt tensioning method. TFCSB provide this services twice annually at Talisman Energy offshore platform.
|
|
 |
|
|