The BSV Temporary Gas Pipeline Project: include a fabrication of 2 Major Skid, Pressure Regulator Skid and Gas Metering Station. |
|

|
 |
Keppel Merlimau Fuel Gas Reducing Skid & Keppel Merlimau UFM Skid ‘ALSTOM |
| |
Keppel Merlimau Fuel Gas Reducing Skid was supplied through Penaga Dresser Sdn. Bhd. for Alstom Power’s project in Singapore (Keppel Merlimau Combined Cycle Power Plant).
The Ultrasonic Flow Meter (UFM) skid supplied through Elster-Instromet S/B. The 470 MW power plant will be commission in July 2006 and it’s locate at Jurong Island in Singapore. TFCSB’s scope of work consists of fabrication, blasting, painting, testing and supply of documentation.
|
|
 |
|
|