What We Do
Oil and Gas Engineering
Fabrication
Natural Gas Pipeline Distribution
Gas Metering Skid Fabrication
Maintenance Services
Structural and Steel Engineering
Plant Piping
Skid Package System
Gas Dry Filter
Shut Down and Maintenance
Blasting and Painting
Metering Station
Fuel Gas Skid
Manpower Supply
 
Highlights
QUALITY ASSURANCE
 
At TFCSB, we strive to provide the highest quality of services and products to our customers.
Our products and services meet customers’ expectations and we continually enhance customer satisfaction.
                             Read More...
SAFETY, HEALTH & ENVIRONMENTAL
 
True Features Corporation Sdn. Bhd. strives to continually improve our performance and minimize the risk of safety, health and environment especially in the oil and gas industry where safety is always the top priority.
We commit to provide a safe and healthy working environment for everyone including the public.
                              Read More...
home site map contacts
Reference Photos
  Pedestrian Bridge, Concrete Pile Cap and Sub-Structure Works Lebuhraya   Damansara-Puchong (LDP), Puchong
 
This project was initiated by Lingkaran Trans Kota Sdn. Bhd. (LITRAK), which involves the construction of the pedestrian bridge crossing LDP at KM 15.6, SS8, Petaling Jaya. The bridge span is 42.8m across the highway, and is located 5.5m above ground.

The bridge is shop fabricated into sections, where the main bridge corridor and staircase consists of three and two sections respectively. All sections are subsequently fitted and welded at site prior to installation.

As LDP is one of the most congested highways in Klang Valley, traffic management was a crucial part of the project. Interruption to vehicle flow had to be reduced to a minimum, while road users safety could not be compromised at all times. Nevertheless, the project was completed within a short time frame of two months.


1   2   3   4   5   6   7   8   9   10   11
Previous Next
   
copyright2006@True Features Corporation Sdn Bhd.