|
 |
Reference Photos |
 |
 |
Port Dickson Lateral Exposed Pipe, Sungai Linggi River Crossing (PD/TOD) |
| |
The PD Lateral Pipeline is owned and operated by Petronas Gas Berhad (PGB). This project involves the rectification work of the 18” 600# exposed pipe at the river crossing using the HDD method, by cutting off the existing pipeline and replacing with new pipe.
|
|
 |
|
|